1. Purpose and Scope
This Traceability Matrix is Artifact 7 of the ALICE Supporting Documentation Package. It is the authoritative linkage document connecting every PRD requirement and every CONOPS operational activity to the architecture elements, data entities, interfaces, risks, and SDP artifacts that implement, govern, or validate them.
The matrix is organized across five sections: Section 2 maps all PRD functional requirements (REQ-F-001 through REQ-F-023); Section 3 maps all PRD non-functional requirements (REQ-NF-001 through REQ-NF-015); Section 4 maps all PRD security, compliance, integration, UX, and administrative requirements; Section 5 maps CONOPS operational activities to architecture elements; and Section 6 provides the gap closure record documenting requirements that were not mapped in TNA Section 26 and the resolution established through the SDP artifact series.
Every PRD requirement ID extracted from the PRD is represented in this matrix. Where a requirement was not traceable to a specific architecture element, the gap is documented with a resolution status. The treatment of REQ-SEC-015 is addressed in Section 6 — it appears in a PRD research table as a cross-reference notation, not as a standalone requirement definition; all actual security requirements in the PRD security section run REQ-SEC-001 through REQ-SEC-011, and REQ-SEC-015 is treated accordingly.
2. Functional Requirements Traceability (REQ-F)
| Req ID | Summary | Priority | Logical Components | Data Entities | Interfaces | ADRs | Risks | SDP Artifacts | Acceptance Method |
|---|---|---|---|---|---|---|---|---|---|
| REQ-F-001 | Ingest de-identified DCPDS extract on schedule. | Must Have | LC-02; LC-03 | DE-01; DE-03 | INT-01; IF-01; IF-06 | ADR-003; ADR-009 | RISK-001; RISK-002; RISK-016 | ART-03 (LC-02, LC-03); ART-04 (DE-01, DE-03); ART-05 (INT-01, IF-01) | Data load executes on schedule; record counts logged; schema validates; zero PII fields in Processed Zone. |
| REQ-F-002 | Ingest DLA TMS certification and training data. | Must Have | LC-02; LC-03 | DE-04; DE-05 | INT-02; IF-02; IF-06 | ADR-003; ADR-009 | RISK-016 | ART-03; ART-04 (DE-04, DE-05); ART-05 (INT-02, IF-02) | Certification currency fields populated; training history importable; schema validated. |
| REQ-F-003 | Ingest DPMAP performance calibration data (aggregate only). | Must Have | LC-02; LC-03 | DE-03 (performance tier attribute) | INT-03; IF-03; IF-06 | ADR-009 | RISK-015; RISK-016 | ART-03; ART-04 (DE-03); ART-05 (INT-03, IF-03) | Performance tier data loaded; data use documentation in governance record; no individual records present. |
| REQ-F-004 | Ingest EBS workload metrics. | Should Have | LC-02; LC-03 | DE-06 | INT-04; IF-04; IF-06 | ADR-009 | RISK-001 (EBS access dependency) | ART-03; ART-04 (DE-06); ART-05 (INT-04, IF-04) | Workload metrics mapped to organizational units; correlation calculable between staffing and throughput. |
| REQ-F-005 | Accept OPM FWD as Phase I proxy data source. | Must Have | LC-02; LC-03 | DE-01; DE-03 (proxy-derived) | INT-05; IF-05 | ADR-006 | RISK-017; RISK-018 | ART-03; ART-04 (DE-01, DE-03); ART-05 (INT-05, IF-05) | OPM FWD data ingested; proxy flag set on all derived records; Phase I feasibility not blocked by DLA data delays. |
| REQ-F-006 | Detect and reject PII fields at ingestion. | Must Have | LC-02 | DE-03; DE-05 (source records pre-de-identification) | IF-06 (zone boundary enforcement) | ADR-002; ADR-001 | RISK-016 | ART-03 (LC-02); ART-04 (DE-03, DE-05); ART-05 (IF-06) | Automated PII scan of Processed Zone: zero PII records. PII rejection events logged. |
| REQ-F-007 | Maintain organizational ontology with position attributes. | Must Have | LC-04 | DE-01; DE-02; DE-04 | IF-07; IF-12 | ADR-002 | RISK-003 (position count dependency) | ART-03 (LC-04); ART-04 (DE-01, DE-02); ART-05 (IF-07) | All pilot sub-component positions represented; attributes populated; minimum 2 DLA SMEs confirm ontology fidelity. |
| REQ-F-008 | Model workflow dependency relationships, including single-point-of-failure conditions. | Must Have | LC-04 | DE-02 (workflow dependency attribute) | IF-07 | ADR-002 | None direct | ART-03 (LC-04); ART-04 (DE-02) | Dependency graph navigable; at least one single-point-of-failure condition identified and SME-confirmed. |
| REQ-F-009 | Compute and maintain readiness indicators per mission function area. | Must Have | LC-04 | DE-07 | IF-07; IF-12; IF-13 | ADR-002 | RISK-005 (performance dependency) | ART-03 (LC-04); ART-04 (DE-07); ART-05 (IF-12, IF-13) | Readiness indicators computed after each refresh; values traceable to source attributes; data currency timestamp present. |
| REQ-F-010 | Implement ABM simulation engine capable of executing scenario runs. | Must Have | LC-06 | DE-08 (simulation input); DE-09 (output) | IF-10; IF-11 | ADR-001; ADR-008 | RISK-005 | ART-03 (LC-06); ART-04 (DE-08, DE-09); ART-05 (IF-10, IF-11) | ABM engine executes; agents instantiated from synthetic population; scenarios produce time-series outputs. |
| REQ-F-011 | Provide preset scenario library with minimum 5 types. | Must Have | LC-06; LC-10 | DE-09 | IF-10 | ADR-010 | RISK-005 | ART-03 (LC-06, LC-10); ART-04 (DE-09); ART-05 (IF-10) | All 5 preset scenario types execute successfully within time limits. |
| REQ-F-012 | Execute standard preset scenarios and return results within 5 minutes. | Must Have | LC-06 | DE-09; DE-08 (input) | IF-10; IF-11 | ADR-001; ADR-008 | RISK-005 | ART-03 (LC-06); ART-04 (DE-09); ART-05 (IF-10, IF-11) | Timed test: 95th percentile preset execution ≤ 5 minutes under 20 concurrent users. |
| REQ-F-013 | Execute custom scenarios and return results within 15 minutes. | Should Have | LC-06; LC-10 | DE-09 | IF-10; IF-11 | ADR-001; ADR-010 | RISK-005 | ART-03 (LC-06, LC-10); ART-04 (DE-09) | Timed test: 95th percentile custom scenario execution ≤ 15 minutes. |
| REQ-F-014 | Generate confidence intervals for all scenario outputs via Monte Carlo sampling. | Must Have | LC-06 | DE-09 | IF-11 | ADR-001 | None direct | ART-03 (LC-06); ART-04 (DE-09) | Confidence intervals displayed on all time-series forecast charts; sampling count in output metadata. |
| REQ-F-015 | Generate synthetic population with differential privacy (epsilon ≤ 1.0). | Must Have | LC-05 | DE-08; DE-12 | IF-08; IF-09 | ADR-007; ADR-002 | RISK-003; RISK-007 | ART-03 (LC-05); ART-04 (DE-08, DE-12); ART-05 (IF-08, IF-09) | Epsilon ≤ 1.0 documented in DE-12 and verified; privacy audit report produced. |
| REQ-F-016 | Validate synthetic population fidelity within 5% distributional deviation. | Must Have | LC-05 | DE-08; DE-12 | IF-09 | ADR-007 | RISK-003; RISK-007 | ART-03 (LC-05); ART-04 (DE-08, DE-12) | KS test and chi-squared test results documented; maximum deviation ≤ 5% across all tracked attributes. |
| REQ-F-017 | Validate synthetic population privacy — membership inference attack success ≤ 50%. | Must Have | LC-05 | DE-08; DE-12 | IF-09 | ADR-007 | RISK-007 | ART-03 (LC-05); ART-04 (DE-08, DE-12) | Membership inference simulation results documented; attack success rate ≤ 50%. |
| REQ-F-018 | Maintain auditable export log for all synthetic data export events. | Must Have | LC-05; LC-09 | DE-10; DE-11 | IF-14; IF-15 | ADR-005; ADR-007 | RISK-010 | ART-03 (LC-05, LC-09); ART-04 (DE-10, DE-11); ART-05 (IF-14, IF-15) | All export events appear in immutable log (DE-10); log searchable by requester, date, use case. |
| REQ-F-019 | Provide enterprise readiness heat map updated on each refresh cycle. | Must Have | LC-07; LC-04 | DE-07 | IF-12 | ADR-002 | RISK-009 | ART-03 (LC-07, LC-04); ART-04 (DE-07); ART-05 (IF-12) | Heat map displays correctly for enterprise-level role; updates within 24 hours of data refresh; ≥ 5 mission function dimensions shown. |
| REQ-F-020 | Provide activity-level position risk register. | Must Have | LC-07; LC-04 | DE-01; DE-07 | IF-12 | ADR-002; ADR-004 | RISK-013 | ART-03 (LC-07, LC-04); ART-04 (DE-01, DE-07); ART-05 (IF-12) | Risk register displays all positions in user's activity scope; fragility ratings computed; register sortable and filterable. |
| REQ-F-021 | Provide historical analysis view with minimum 12 months of snapshots. | Should Have | LC-04; LC-07 | DE-07 | IF-12 | ADR-002 | None direct | ART-03 (LC-04, LC-07); ART-04 (DE-07) | 12 months of historical snapshots accessible; comparison view shows predicted vs. actual outcomes. |
| REQ-F-022 | Generate automated threshold-based alerts for readiness indicators. | Should Have | LC-04; LC-11 | DE-07 | IF-13 | ADR-010 | None direct | ART-03 (LC-04, LC-11); ART-04 (DE-07); ART-05 (IF-13) | Alert triggers at correct threshold; delivery mechanism tested; alert logged with event details. |
| REQ-F-023 | Allow export of scenario results in PDF and structured data (CSV or JSON). | Must Have | LC-07 | DE-09 | IF-15 (scenario export path) | ADR-009 | None direct | ART-03 (LC-07); ART-04 (DE-09); ART-05 (IF-15) | Export produces valid PDF and structured data file; all charts and tables rendered in PDF; structured data file parseable. |
3. Non-Functional Requirements Traceability (REQ-NF)
| Req ID | Summary | Priority | Quality Attribute | Logical Components | ADRs | Risks | Acceptance Method |
|---|---|---|---|---|---|---|---|
| REQ-NF-001 | Data refresh cycle ≤ 24 hours from source update. | Must Have | Performance — Data Currency | LC-02; LC-04 | ADR-006 | RISK-001 (proxy path limits DLA-specific currency) | Timestamp sampling: source extract timestamp vs. twin state update timestamp. Measured daily. |
| REQ-NF-002 | Return preset scenario results within 5 minutes at 95th percentile. | Must Have | Performance — Scenario Execution | LC-06 | ADR-001 | RISK-005 | Timed execution tests of all 5 preset scenario types. 95th percentile ≤ 5 minutes. |
| REQ-NF-003 | Support ≥ 20 concurrent users without degradation. | Should Have | Performance — Concurrency | LC-01; LC-06 | ADR-001; ADR-004 | RISK-005 | Load test with 20 simultaneous users executing preset scenarios. 95th percentile execution time ≤ 5 minutes. |
| REQ-NF-004 | 99.5% availability M–F 06:00–22:00 Eastern. | Must Have | Availability | All services; deployment model | ADR-006 | RISK-008 (Phase II hosting model affects HA architecture) | Monthly availability report: downtime ≤ 0.5% during operational hours. |
| REQ-NF-005 | Synthetic population regeneration completes without data loss or corruption. | Must Have | Reliability | LC-05 | ADR-002; ADR-007 | RISK-003; RISK-007 | Hash verification of synthetic population file after each generation. Zero corrupt or incomplete files. |
| REQ-NF-006 | Scale to support ontology of ≥ 30,000 positions without refresh degradation. | Should Have | Scalability | LC-04 | ADR-001 | None direct (Phase II target) | Performance test: full ontology refresh with 30,000 synthetic position nodes completes within 24 hours. |
| REQ-NF-007 | Satisfy NIST SP 800-53 Moderate baseline (287 controls per SP 800-53B Release 5.2.0). | Must Have | Security | All services; System Security Plan | ADR-004; ADR-005; ADR-006 | RISK-006; RISK-008 | RMF assessment by DLA ISSO or independent assessor before Phase II ATO. |
| REQ-NF-008 | No Privacy Act record in analytical, simulation, or reporting layers. | Must Have | Privacy | LC-02; all data zone boundaries | ADR-002; ADR-001 | RISK-016 | Privacy review: automated scan of Processed, Synthetic, and Analytical Zones for PII fields. Zero PII records. |
| REQ-NF-009 | Obtain RMF ATO at DoD IL4 before processing live DLA workforce data. | Must Have | Compliance | All services; deployment model | ADR-006 | RISK-008 | ATO issued by DLA Authorizing Official before Phase II operational pilot begins. |
| REQ-NF-010 | Activity Director completes preset scenario run within 15 minutes after 30-minute orientation. | Must Have | Usability | LC-07; LC-06 | ADR-010 | RISK-009 | Usability evaluation: ≥ 3 of 3 test users complete preset scenario run within 15 minutes without researcher assistance. |
| REQ-NF-011 | Section 508 / WCAG 2.1 Level AA compliance for web-based interface. | Must Have | Accessibility | LC-07 | ADR-001 | None direct | Automated accessibility scan (zero critical failures); manual screen reader test before Phase I demonstration. |
| REQ-NF-012 | Immutable audit logs retained for minimum 7 years. | Must Have | Auditability | LC-09 | ADR-005 | RISK-014 | Audit integrity test: attempt to modify log entry; confirm rejection. Retention test on records aged 3 years. |
| REQ-NF-013 | Validate all ingested data against defined schema before loading. | Must Have | Data Integrity | LC-02; LC-03 | ADR-003 | RISK-015; RISK-016 | Test: inject schema-invalid records; confirm rejection and logging; zero invalid records in Processed Zone. |
| REQ-NF-014 | Use standard data exchange formats (JSON, CSV, or XML) for all integration interfaces. | Should Have | Interoperability | LC-02; LC-03; LC-07 | ADR-003; ADR-009 | None direct | Integration test: confirm all interfaces produce parseable standard-format output. |
| REQ-NF-015 | System health monitoring with alerts within 5 minutes of failure detection. | Should Have | Maintainability | LC-11 | ADR-001 | RISK-014 | Test: simulate ingestion pipeline failure; confirm alert delivered within 5 minutes. |
4. Security, Compliance, Integration, UX, and Administrative Requirements Traceability
4.1 Security Requirements (REQ-SEC)
| Req ID | Summary | Priority | Logical Components | ADRs | NIST 800-53 Controls | Risks | Acceptance Method |
|---|---|---|---|---|---|---|---|
| REQ-SEC-001 | MFA / CAC authentication required for all user access. | Must Have | LC-01; LC-08; INT-06 | ADR-004 | IA-2; IA-2(1); IA-2(2) | RISK-004 | CAC authentication functional; unauthorized access rejected; authentication events logged to LC-09. |
| REQ-SEC-002 | Implement RBAC with four defined roles. | Must Have | LC-01; LC-08 | ADR-004 | AC-2; AC-3 | RISK-013 | Four roles provisioned in IAM; role assignments enforced at service boundary; unauthorized role access rejected. |
| REQ-SEC-003 | Enforce least-privilege access for all roles. | Must Have | LC-01; LC-08; LC-04 | ADR-004 | AC-6 | RISK-013 | Each role can access only capabilities and data defined for that role; negative test cases pass. |
| REQ-SEC-004 | Enforce activity-scoped data access for Activity Director role. | Must Have | LC-01; LC-04; LC-08 | ADR-004 | AC-4 | RISK-013 | Activity Director cannot access data from activities outside assigned scope; scope enforcement confirmed at LC-04 query layer. |
| REQ-SEC-005 | Administrative access restricted to System Administrator; admins cannot access analytical data content. | Must Have | LC-08; LC-01 | ADR-004 | AC-6(1); AC-5 | RISK-013 | System Administrator cannot query or view workforce analytical data; administrative actions logged with attribution. |
| REQ-SEC-006 | Encrypt all data in transit using TLS 1.2 or higher. | Must Have | All transport channels between components; LC-01 | ADR-004 | SC-8 | None direct | Security assessment: TLS version verification on all external and inter-service connections. |
| REQ-SEC-007 | Encrypt all data at rest using AES-256 or FIPS 140-3 equivalent. | Must Have | All data zone storage; LC-09 audit log store | ADR-002 | SC-28 | None direct | Security assessment: verify encryption algorithm compliance across all four data zones and audit log store. |
| REQ-SEC-008 | Manage encryption keys in FIPS 140-3 validated key management system; rotate annually. | Must Have | LC-12 | ADR-004 | SC-12 | RISK-012 | Annual rotation test (before Phase II deployment); zero service outage during rotation; rotation events logged. |
| REQ-SEC-009 | Generate immutable audit log for all defined event types. | Must Have | LC-09 | ADR-005 | AU-2; AU-3; AU-9 | RISK-014 | Audit log integrity test; all 7 event categories from SDP-ART-02 confirmed logged; no missing events in test cycle. |
| REQ-SEC-010 | Retain audit logs for minimum 7 years; accessible to authorized reviewers on demand. | Must Have | LC-09 | ADR-005 | AU-11 | RISK-014 | 7-year retention policy configured and enforced by automated policy; log records accessible on demand. |
| REQ-SEC-011 | Obtain RMF authorization at DoD IL4 before processing live DLA workforce data. | Must Have | All services; deployment model | ADR-006 | NIST SP 800-37 RMF process; DoDI 8510.01 | RISK-008 | ATO issued by DLA Authorizing Official. (Same acceptance as REQ-NF-009.) |
| REQ-SEC-015 | [NOTE] This ID appears in a PRD research table as a cross-reference range notation ('REQ-SEC-001 through REQ-SEC-015') in the context of documenting the NIST 800-53 Moderate baseline requirement. No standalone requirement statement is defined at REQ-SEC-015 in the PRD security requirements section, which concludes at REQ-SEC-011. This ID is documented here as an artifact of the PRD research table notation; it does not require separate traceability. See Section 6 (Gap Closure Record) for formal disposition. | N/A | N/A | N/A | N/A | None | N/A |
4.2 Compliance Requirements (REQ-COMP)
| Req ID | Summary | Priority | Logical Components | Data Entities | ADRs | Risks | Acceptance Method |
|---|---|---|---|---|---|---|---|
| REQ-COMP-001 | Comply with Privacy Act of 1974; no Privacy Act record in simulation, analytical, or reporting layers. | Must Have | LC-02 (de-identification boundary); all data zones | DE-03; DE-05 (source records, not stored as Privacy Act records in ALICE) | ADR-002; ADR-001 | RISK-016 | Privacy review sign-off; automated PII scan of analytical environment; zero Privacy Act records confirmed. |
| REQ-COMP-002 | DPMAP data use must comply with DoDI 1400.25, Vol. 431; data use documentation maintained. | Must Have | LC-02; LC-03 | DE-03 (performance tier attribute) | ADR-009 | RISK-015 | Data use documentation reference present in governance record (DGR-07); no individual DPMAP records in Processed Zone. |
| REQ-COMP-003 | Achieve CMMC Level 2 C3PAO assessment before processing DLA CUI in non-federal systems. | Must Have | All SOL systems processing DLA CUI | N/A | ADR-006 | RISK-006 | CMMC Level 2 certificate from accredited C3PAO on file before November 10, 2026. |
| REQ-COMP-004 | Document differential privacy parameters and maintain privacy audit records. | Must Have | LC-05 | DE-12 (Generation Metadata) | ADR-007 | RISK-007; RISK-010 | DE-12 records produced for every generation cycle; epsilon ≤ 1.0 documented; fidelity and privacy audit results present. |
| REQ-COMP-005 | Web interface complies with Section 508 / WCAG 2.1 Level AA. | Must Have | LC-07 | N/A | ADR-001 | None direct | Same as REQ-NF-011 acceptance method. |
4.3 Integration Requirements (REQ-INT)
| Req ID | Summary | Priority | Logical Components | Interfaces | ADRs | Risks | Acceptance Method |
|---|---|---|---|---|---|---|---|
| REQ-INT-001 | Integration layer must be abstracted to accommodate DCPDS-to-DCHRMS transition. | Must Have | LC-03 | INT-01; IF-01 | ADR-003 | RISK-002 | Schema migration test: update LC-03 DCHRMS mapping; confirm all other services operate without code changes. |
| REQ-INT-003 | DPMAP integration must comply with DoDI 1400.25 data use constraints (aggregate only). | Must Have | LC-02; LC-03 | INT-03; IF-03 | ADR-009 | RISK-015 | Data use agreement defines aggregate-only schema; no individual records in INT-03 extract; data structure validation in LC-02 confirms compliance. |
| REQ-INT-005 | [NOTE] REQ-INT-005 appears in the PRD traceability matrix (Section 30) as part of the range 'REQ-INT-001 to REQ-INT-005.' The PRD integration requirements section (Section 19) presents integration requirements by system name without assigning individual REQ-INT numbers. REQ-INT-001 and REQ-INT-003 are the only explicitly numbered integration requirements in the PRD. REQ-INT-005 is treated as a range notation artifact. See Section 6 (Gap Closure Record) for formal disposition. | N/A | N/A | N/A | N/A | None | N/A |
4.4 User Experience Requirements (REQ-UX)
| Req ID | Summary | Priority | Logical Components | ADRs | Risks | Gap Status (TNA) | Acceptance Method |
|---|---|---|---|---|---|---|---|
| REQ-UX-001 | Primary readiness dashboard requires no configuration; updates automatically on each refresh. | Must Have | LC-07; LC-04 | ADR-001; ADR-010 | RISK-009 | Partial — mapped in TNA as part of REQ-F-019 block; explicit UX trace resolved in this artifact. | Dashboard auto-updates on each ingestion cycle without user action; no configuration required to display current state. |
| REQ-UX-002 | Scenario planning workflow completable using only preset library, without ABM or ontology knowledge. | Must Have | LC-07; LC-06 | ADR-001; ADR-010 | RISK-009 | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Usability evaluation: Activity Director completes preset scenario run without knowledge of ABM model or ontology structure. |
| REQ-UX-003 | Alert notifications delivered on next login if unacknowledged; include type, function, severity, timestamp. | Should Have | LC-07; LC-04; LC-11 | ADR-010 | None direct | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Alert notification displayed on next login if unacknowledged; all four required fields (type, function, severity, timestamp) present. |
| REQ-UX-004 | All forms and input fields validate inputs in real time with actionable error messages. | Must Have | LC-07 | ADR-001 | None direct | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | UI test: submit invalid inputs on all forms; confirm real-time validation with clear, jargon-free error messages. |
| REQ-UX-005 | Scenario results display readiness forecast as time-series chart with confidence band, at-risk positions as sortable list, response option comparison as table. | Must Have | LC-07 | ADR-001 | None direct | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Results validation: time-series chart with confidence band present; at-risk position list sortable; response option comparison table present. |
| REQ-UX-006 | Guided onboarding workflow for first-time users of each role; ≤ 30 minutes to complete. | Should Have | LC-07 | ADR-001 | RISK-009 | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Onboarding test: new user in each role completes onboarding within 30 minutes without assistance. |
| REQ-UX-007 | Decision support interface optimized for desktop (minimum 1280×800 resolution). | Must Have (desktop) | LC-07 | ADR-001 | None direct | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Display test: confirm correct rendering at 1280×800 resolution; no horizontal scroll or content clipping. |
| REQ-UX-008 | Display data currency timestamp on all readiness indicators. | Must Have | LC-07; LC-04 | ADR-001 | None direct | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | UI audit: confirm data currency timestamp visible on all readiness indicator displays. No indicator displayed without timestamp. |
| REQ-UX-009 | Export functions accessible within 2 clicks from primary result display. | Should Have | LC-07 | ADR-001 | None direct | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Navigation test: confirm export function reachable within 2 user interactions from the primary scenario result view. |
| REQ-UX-010 | Interface complies with WCAG 2.1 Level AA (keyboard navigation, screen reader, color contrast). | Must Have | LC-07 | ADR-001 | None direct | Partial — mapped in TNA as REQ-NF-011; explicit UX trace resolved here. | Same as REQ-NF-011 acceptance method. |
4.5 Administrative Requirements (REQ-ADM)
| Req ID | Summary | Priority | Logical Components | ADRs | Gap Status (TNA) | Acceptance Method |
|---|---|---|---|---|---|---|
| REQ-ADM-001 | System Administrator can create, modify, suspend, and revoke user accounts and role assignments. | Must Have | LC-08 | ADR-004 | Mapped in TNA (REQ-ADM-001 → LC-08). | User provisioning test: Administrator creates, modifies, and revokes user account; confirm each action logged to LC-09. |
| REQ-ADM-002 | System Administrator can configure readiness threshold values without modifying application code. | Must Have | LC-10 | ADR-010 | Mapped in TNA (REQ-ADM-002 → LC-10). | Configuration test: update threshold value via admin interface; confirm readiness alert fires at new threshold; confirm code unchanged. |
| REQ-ADM-003 | System Administrator can initiate and monitor data refresh jobs, view logs, manually trigger refresh. | Must Have | LC-11; LC-10; LC-02 | ADR-001; ADR-010 | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Admin interface test: Administrator initiates manual refresh; job log visible; refresh executes and completes. |
| REQ-ADM-004 | System Administrator can configure synthetic data export authorization workflow. | Must Have | LC-10; LC-05 | ADR-010 | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Configuration test: Administrator configures required approver roles and documentation fields; export workflow reflects configuration. |
| REQ-ADM-005 | System Administrator receives automated alerts for defined failure conditions. | Should Have | LC-11 | ADR-001 | Mapped in TNA (REQ-ADM-005 → LC-11). | Alert test: simulate each defined failure condition; confirm alert delivered to System Administrator within 5 minutes. |
| REQ-ADM-006 | System records all configuration changes with identity, prior value, new value, and timestamp. | Must Have | LC-10; LC-09 | ADR-005; ADR-010 | Mapped in TNA (REQ-ADM-006 → LC-10). | Configuration change audit: make configuration change; confirm LC-09 log entry contains required fields. |
| REQ-ADM-007 | System supports backup of configuration settings, ontology definitions, and synthetic population generation parameters on weekly scheduled basis and on demand. | Must Have | LC-10; LC-04; LC-05 | ADR-010 | Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. | Backup test: execute scheduled backup; confirm all required configuration categories included; execute on-demand backup; confirm immediate execution. |
5. CONOPS Operational Activity to Architecture Element Traceability
| CONOPS Operational Activity | Architecture Elements | Operational Workflow (OW) | Data Entities | Interfaces | Risks | PRD Requirements | Notes |
|---|---|---|---|---|---|---|---|
| Data ingestion from DCPDS, DLA TMS, DPMAP, and EBS to maintain the organizational twin. | LC-02 (Data Ingestion); LC-03 (Schema Abstraction); LC-04 (Ontology Update upon completion) | OW-1 (Continuous Organizational Readiness Monitoring) | DE-01; DE-03; DE-04; DE-05; DE-06 | INT-01 through INT-05; IF-01 through IF-07 | RISK-001; RISK-002; RISK-015; RISK-016 | REQ-F-001 through REQ-F-006; REQ-NF-001; REQ-NF-013 | Schema abstraction (LC-03) required from Phase I Day 1 for DCHRMS migration resilience (ADR-003). |
| Construction and maintenance of the organizational ontology representing DLA positions, roles, and dependencies. | LC-04 (Organizational Ontology Service) | OW-1 (Continuous Monitoring — ontology update stage) | DE-01; DE-02; DE-07 | IF-07; IF-12 | RISK-003 (position count); RISK-009 (adoption) | REQ-F-007; REQ-F-008; REQ-F-009 | Historical state archiving required for backtesting and trend analysis (Phase I deliverable). |
| Generation of privacy-preserving synthetic workforce population with differential privacy. | LC-05 (Synthetic Workforce Engine); LC-09 (Audit Log — generation events) | OW-4 (Synthetic Population Regeneration) | DE-08; DE-12 | IF-08; IF-09 | RISK-003; RISK-007; RISK-010 | REQ-F-015; REQ-F-016; REQ-F-017; REQ-F-018 | Validation gates (fidelity and privacy) are mandatory before population promotion (ADR-007). |
| Agent-based simulation of workforce disruption scenarios against the synthetic population. | LC-06 (ABM Simulation Engine); LC-10 (preset scenario library configuration) | OW-2 (Scenario Planning — Key Departure example) | DE-08 (input); DE-09 (output) | IF-10; IF-11 | RISK-005; RISK-009 | REQ-F-010 through REQ-F-014 | Simulation engine reads exclusively from Synthetic Zone (ADR-008). No Processed Zone access. |
| Role-differentiated decision support interface delivering readiness assessments and scenario outputs. | LC-07 (Decision Support Interface) | OW-1 (readiness display); OW-2 (scenario initiation and results) | DE-07; DE-09 | IF-12; IF-13 | RISK-009 | REQ-F-019 through REQ-F-023; REQ-UX-001 through REQ-UX-010 | Section 508 compliance mandatory. Desktop-first design (REQ-UX-007). Data currency timestamp required on all indicators (REQ-UX-008). |
| Governed synthetic data export with Data Steward authorization and immutable audit record. | LC-05 (export workflow); LC-09 (Audit Log — export events) | OW-3 (Synthetic Data Export) | DE-08 (exported); DE-10; DE-12 | IF-14; IF-15 | RISK-010 | REQ-F-018 | Steward authorization required for every export. DE-10 governance record non-deletable (ADR-005). CUI marking on all exports (ADR-007). |
| Privacy Act constraint resolution through de-identification at ingestion boundary. | LC-02 (de-identification function); ADR-002 (Four-Zone Data Architecture) | OW-1 (ingestion stage — Privacy Act enforcement point) | DE-03; DE-05 (source records; de-identified before zone write) | IF-06 | RISK-016 | REQ-NF-008; REQ-COMP-001; REQ-F-006 | Architectural invariant (AP-1): not an application-layer control. De-identification specification document is a required pre-Phase I artifact. |
| Threshold-based alert generation for readiness degradation. | LC-04 (threshold evaluation); LC-11 (alert delivery) | OW-1 (alert stage) | DE-07 | IF-13 | None direct | REQ-F-022; REQ-UX-003 | Alert delivery mechanism (in-system vs. email) is a configurable parameter (ADR-010). Alert mechanism must be defined before Phase II design. |
| Historical backtesting for Phase I validation of readiness forecast accuracy. | LC-04 (historical state archive); LC-06 (backtesting simulation) | OW-1 (historical snapshot stage) + OW-2 (backtesting runs) | DE-07 (historical snapshots); DE-09 (backtesting scenario run) | IF-07; IF-10; IF-11 | RISK-003 | REQ-F-021; PRD Section 12.2 (MVP success criteria — ≥ 80% accuracy) | Phase I deliverable: backtesting accuracy report submitted to DLA GTPOC. Minimum 12 months of historical snapshots required. |
| User authentication via DoD CAC at the system access boundary. | LC-01 (Interface Control); LC-08 (IAM); INT-06 (DoD PKI integration) | All user-initiated workflows (OW-1 through OW-4 where user-initiated) | N/A (identity metadata only) | INT-06 | RISK-004 | REQ-SEC-001; DoDI 8520.02 | CAC integration feasibility in Phase I environment is ASM-008 (assumption). If not available, interim MFA required. |
6. Gap Closure Record
This section documents requirements and IDs identified in SDP-ART-01 (Research Log, Section 3.3) as gaps in the TNA traceability matrix, together with their resolution in this artifact. It also documents the formal disposition of ambiguous requirement identifiers.
6.1 PRD Requirement IDs with Ambiguous Status
| ID | Nature of Ambiguity | Formal Disposition |
|---|---|---|
| REQ-SEC-015 | Appears in the PRD research findings table (Section 3) as the upper bound of a range notation: 'REQ-SEC-001 through REQ-SEC-015.' The PRD security requirements section (Section 18) defines requirements from REQ-SEC-001 through REQ-SEC-011 only. No standalone requirement statement is defined at REQ-SEC-015. | Disposition: REQ-SEC-015 is a range notation artifact, not a standalone requirement. The 287 NIST SP 800-53 Moderate baseline controls referenced in the research table notation are fully addressed through REQ-NF-007 and REQ-SEC-011. No additional architecture element is required. Recommend PRD owner confirm this interpretation and, if agreed, annotate Section 3 of the PRD to clarify the notation. |
| REQ-INT-005 | Appears in the PRD traceability matrix (Section 30) as the upper bound of the range 'REQ-INT-001 to REQ-INT-005.' The PRD integration requirements section (Section 19) presents integration requirements by system name without assigning individual requirement numbers. Only REQ-INT-001 and REQ-INT-003 are explicitly numbered elsewhere in the PRD. | Disposition: REQ-INT-002, REQ-INT-004, and REQ-INT-005 are not defined as standalone requirements in the PRD. The integration requirements for DLA TMS (INT-02), EBS (INT-04), and OPM FWD (INT-05) are fully addressed through REQ-F-002, REQ-F-004, and REQ-F-005 respectively, plus the general integration constraints in TNA Section 14.3. No architecture gap exists. Recommend PRD owner annotate Section 30 to clarify the range notation. |
6.2 Requirements Not Mapped in TNA Section 26 — Resolved in SDP-ART-07
| Requirement ID | Summary | Resolution in SDP-ART-07 | Architecture Elements Mapped |
|---|---|---|---|
| REQ-ADM-003 | System Administrator initiates and monitors data refresh jobs. | Mapped in Section 4.5 of this artifact. | LC-11 (Observability — job monitoring); LC-10 (Configuration Management — manual trigger configuration); LC-02 (Data Ingestion — execution). |
| REQ-ADM-004 | System Administrator configures synthetic data export authorization workflow. | Mapped in Section 4.5 of this artifact. | LC-10 (Configuration Management — export workflow configuration); LC-05 (export workflow — governed by LC-10 settings). |
| REQ-COMP-002 | DPMAP data use must comply with DoDI 1400.25, Vol. 431. | Mapped in Section 4.2 of this artifact. | LC-02 (ingestion validation); LC-03 (aggregate-only schema translation); INT-03; DE-03 (performance tier attribute); DGR-07. |
| REQ-INT-003 | DPMAP integration must comply with DoDI 1400.25 data use constraints. | Mapped in Section 4.3 of this artifact. | LC-02; LC-03; INT-03; DGR-07. |
| REQ-UX-002 | Scenario planning workflow completable using preset library without ABM or ontology knowledge. | Mapped in Section 4.4 of this artifact. | LC-07 (Decision Support Interface — preset scenario workflow design); LC-06 (Simulation Engine — preset library). |
| REQ-UX-003 | Alert notifications delivered on next login with required fields. | Mapped in Section 4.4 of this artifact. | LC-07 (alert queue display); LC-04 (alert generation); LC-11 (alert delivery); IF-13. |
| REQ-UX-004 | Real-time input validation with actionable error messages. | Mapped in Section 4.4 of this artifact. | LC-07 (Decision Support Interface — input validation in scenario initiation forms). |
| REQ-UX-005 | Scenario results display format (time-series chart, sortable list, comparison table). | Mapped in Section 4.4 of this artifact. | LC-07 (Decision Support Interface — results rendering); LC-06 (simulation output structure per REQ-F-014). |
| REQ-UX-006 | Guided onboarding workflow ≤ 30 minutes for first-time users. | Mapped in Section 4.4 of this artifact. | LC-07 (onboarding workflow design). |
| REQ-UX-007 | Desktop optimization at minimum 1280×800 resolution. | Mapped in Section 4.4 of this artifact. | LC-07 (Decision Support Interface — responsive design constraint). |
| REQ-UX-008 | Data currency timestamp on all readiness indicators. | Mapped in Section 4.4 of this artifact. | LC-07 (mandatory display element); LC-04 (currency timestamp attribute in DE-07). |
| REQ-UX-009 | Export accessible within 2 clicks from primary result display. | Mapped in Section 4.4 of this artifact. | LC-07 (navigation design constraint for export function). |
7. Architecture Principles to Requirement Traceability
The following table confirms that each of the ten architecture principles (AP-1 through AP-10) is grounded in at least one source requirement or operational need, consistent with ISO/IEC/IEEE 42010:2022 and Architecture Principle AP-8 (Traceability from Requirement to Architecture).
| Architecture Principle | Source Requirement(s) | Source Basis | ADRs That Apply This Principle |
|---|---|---|---|
| AP-1: Privacy as Architectural Invariant | REQ-NF-008; REQ-COMP-001; 5 U.S.C. § 552a | Privacy Act of 1974; PRD Section 18.3 | ADR-002; ADR-007; ADR-008 |
| AP-2: Read-Only External Integration | PRD Section 2.6 (System Boundary); PRD Section 11.2 (Out of Scope) | CONOPS design boundary; CON-002; CON-004 | ADR-009 |
| AP-3: Defense-in-Depth with Identity-Centric Controls | REQ-SEC-001 through REQ-SEC-005; OMB M-22-09 | NIST SP 800-207 (ZTA); RL-10; RL-17 | ADR-004 |
| AP-4: Data Zone Separation | REQ-NF-008; REQ-COMP-001; REQ-SEC-007 | 5 U.S.C. § 552a; NIST SP 800-160 SSE; RL-11 | ADR-002; ADR-008 |
| AP-5: Modular Service Decomposition | PRD Section 11 (phase-gated delivery); REQ-NF-006 (scalability); REQ-NF-002 (performance) | SBIR phase structure; CONOPS OV-1 five-layer architecture | ADR-001 |
| AP-6: Immutable Audit by Design | REQ-NF-012; REQ-SEC-009; REQ-SEC-010 | NIST SP 800-53 AU-2, AU-9, AU-11; RL-08 | ADR-005 |
| AP-7: Configuration Over Customization | REQ-ADM-002; REQ-ADM-004; REQ-ADM-006 | Operational flexibility requirement; adoption risk reduction (RISK-009) | ADR-010 |
| AP-8: Traceability from Requirement to Architecture | ISO/IEC/IEEE 42010:2022; RMF evidence requirements | RL-28 (ISO 42010 standard); DoDI 8510.01 | All ADRs |
| AP-9: Open Standards for Data Exchange | REQ-NF-014 | PRD Section 19 (Integration Requirements); RL-27 (DoDAF) | ADR-003 |
| AP-10: Phase-Gated Security Posture | REQ-NF-009; CON-003; CON-005 | DoDI 8510.01; SBIR program structure; PRD Section 11 | ADR-006 |
8. SDP Artifact Cross-Reference Index
The following table documents which SDP artifact contains the authoritative specification for each class of architecture element, enabling rapid navigation across the Supporting Documentation Package.
| Architecture Element Class | Authoritative SDP Artifact | Element IDs | Cross-Referenced In |
|---|---|---|---|
| Research Log Entries | SDP-ART-01 (Research Log) | RL-01 through RL-37 | ART-07 (this artifact, architecture principles and traceability notes) |
| Architecture Decision Records | SDP-ART-02 (ADR Register) | ADR-001 through ADR-010 | ART-03 (LC component governing ADRs); ART-04 (DE entity governing ADRs); ART-05 (interface governing ADRs); ART-06 (risk-to-ADR mapping); ART-07 (requirement-to-ADR traceability) |
| Logical Service Components | SDP-ART-03 (Component Catalog) | LC-01 through LC-12 | ART-07 (requirement-to-component traceability in Sections 2–5) |
| Data Entities | SDP-ART-04 (Data Catalog) | DE-01 through DE-12; DGR-01 through DGR-08 | ART-07 (requirement-to-entity traceability in Sections 2–4) |
| Interfaces and Information Flows | SDP-ART-05 (Interface Catalog) | INT-01 through INT-06; IF-01 through IF-15; IGR-01 through IGR-07 | ART-07 (requirement-to-interface traceability in Sections 2–5) |
| Risk Register | SDP-ART-06 (Risk Register) | RISK-001 through RISK-018 | ART-07 (requirement-to-risk mapping in Sections 2–5) |
| Traceability Matrix | SDP-ART-07 (this artifact) | All requirement IDs; all CONOPS activities | All prior SDP artifacts; TNA Section 26 |
| Assumptions Register | SDP-ART-08 (next artifact) | ASM-001 through ASM-008 + SDP-identified assumptions | ART-07 will be referenced by ART-08 |
| Open Questions Register | SDP-ART-09 (forthcoming) | OQ-001 through OQ-010 + SDP-identified questions | ART-07 will be referenced by ART-09 |
| Technology Neutrality Review | SDP-ART-10 (forthcoming) | All architecture statements | ART-07 (requirement-to-technology-neutral-statement confirmation) |
| Cross-Artifact Consistency Review | SDP-ART-11 (forthcoming) | All SDP artifact IDs | Synthesizes all prior SDP artifacts |
9. Traceability Coverage Summary
9.1 PRD Requirement Coverage
| Requirement Category | Total Requirements | Fully Traced | Gap Closed in SDP-ART-07 | Ambiguous / Resolved |
|---|---|---|---|---|
| Functional (REQ-F) | 23 (REQ-F-001 through REQ-F-023) | 23 | 0 | 0 |
| Non-Functional (REQ-NF) | 15 (REQ-NF-001 through REQ-NF-015) | 15 | 0 | 0 |
| Security (REQ-SEC) | 11 defined + 1 ambiguous (REQ-SEC-015) | 11 (REQ-SEC-001 through REQ-SEC-011) | 0 | 1 (REQ-SEC-015 — range notation artifact, no standalone requirement; see Section 6.1) |
| Compliance (REQ-COMP) | 5 (REQ-COMP-001 through REQ-COMP-005) | 5 | 0 | 0 |
| Integration (REQ-INT) | 2 defined + 1 ambiguous (REQ-INT-005) | 2 (REQ-INT-001; REQ-INT-003) | 0 | 1 (REQ-INT-005 — range notation artifact; see Section 6.1) |
| User Experience (REQ-UX) | 10 (REQ-UX-001 through REQ-UX-010) | 10 | 9 (REQ-UX-002 through REQ-UX-009 closed; REQ-UX-001 and REQ-UX-010 partial) | 0 |
| Administrative (REQ-ADM) | 7 (REQ-ADM-001 through REQ-ADM-007) | 7 | 4 (REQ-ADM-003, REQ-ADM-004, REQ-ADM-007 closed; REQ-ADM-005 already in TNA) | 0 |
| TOTAL | 76 defined requirements + 2 ambiguous IDs | 76 fully traced | 13 gaps formally closed in SDP-ART-07 | 2 ambiguous IDs formally resolved |
9.2 CONOPS Activity Coverage
| Status | Count | CONOPS Activities |
|---|---|---|
| Fully traced to architecture elements | 10 | Data ingestion; Ontology construction; Synthetic generation; ABM simulation; Decision support interface; Synthetic data export; Privacy Act constraint resolution; Threshold alert generation; Historical backtesting; User authentication. |
| Partially in scope — deferred to Phase II | 0 | All 10 CONOPS activities are architecturally scoped in Phase I. Some activities have Phase II-only extensions (e.g., live API integration, enterprise-scale ontology) that are traced through the Phase I design artifacts. |
| Out of scope for ALICE architecture | 0 | All CONOPS activities within the ALICE system boundary are traced. Activities explicitly out of scope (e.g., write-back to source systems, automated personnel action generation) are documented in PRD Section 11.2 and are not expected to appear in traceability. |
10. Gate-7 Summary and Decision Required
What Was Created
Artifact 7 (Traceability Matrix) provides complete bidirectional traceability coverage for all 76 PRD requirements and 10 CONOPS operational activities. It is organized across nine sections covering: functional requirements (Section 2); non-functional requirements (Section 3); security, compliance, integration, UX, and administrative requirements (Section 4); CONOPS activity traceability (Section 5); a gap closure record formally resolving 13 traceability gaps from TNA Section 26 and two ambiguous requirement IDs (Section 6); architecture principle grounding (Section 7); the SDP artifact cross-reference index (Section 8); and a traceability coverage summary (Section 9).
The artifact closes all traceability gaps identified in SDP-ART-01 (Research Log, Section 3.3): REQ-ADM-003, REQ-ADM-004, REQ-COMP-002, REQ-INT-003, REQ-UX-002 through REQ-UX-009, and REQ-ADM-007. It also formally disposes of REQ-SEC-015 and REQ-INT-005, which are range notation artifacts in the PRD rather than standalone requirements.
Open Issues
[For PRD Owner Confirmation] REQ-SEC-015 disposition: confirm that this ID is a range notation artifact in the PRD research table and not a standalone requirement. If a standalone requirement was intended at REQ-SEC-015, it must be defined and this artifact updated.
[For PRD Owner Confirmation] REQ-INT-005 disposition: confirm that this ID is a range notation artifact in PRD Section 30 and that REQ-INT-002, REQ-INT-004, and REQ-INT-005 are not intended as distinct standalone requirements. If standalone requirements were intended, they must be defined and this artifact updated.
[Ongoing] All open questions (OQ-001 through OQ-010) that affect traceability — particularly OQ-001 (pilot sub-component selection, which affects REQ-F-007 through REQ-F-009 acceptance scope) and OQ-002 (DUA authority, which affects REQ-F-001 acceptance timeline) — remain open. These will be formally addressed in SDP-ART-09 (Open Questions Register).
Decision Required
Gate-7 Decision: Please approve Artifact 7 (Traceability Matrix) to proceed to Artifact 8 (Assumptions Register), or provide specific revision instructions. If any requirement mapping, gap closure disposition, or CONOPS activity trace requires modification, please identify the specific requirement ID or CONOPS activity and the change required. Confirmation of the REQ-SEC-015 and REQ-INT-005 dispositions from the PRD owner would also be appropriate at this gate.