ALICE Traceability Matrix

How every ALICE requirement and CONOPS operational activity traces to the architecture elements, data entities, interfaces, risks and artifacts that implement or govern it

David Daniel
The Daniel Group LLC · Affiliated with SOL Engineering Services
PUBLISHED
READING TIME
24 min
Download PDF

1. Purpose and Scope

This Traceability Matrix is Artifact 7 of the ALICE Supporting Documentation Package. It is the authoritative linkage document connecting every PRD requirement and every CONOPS operational activity to the architecture elements, data entities, interfaces, risks, and SDP artifacts that implement, govern, or validate them.

The matrix is organized across five sections: Section 2 maps all PRD functional requirements (REQ-F-001 through REQ-F-023); Section 3 maps all PRD non-functional requirements (REQ-NF-001 through REQ-NF-015); Section 4 maps all PRD security, compliance, integration, UX, and administrative requirements; Section 5 maps CONOPS operational activities to architecture elements; and Section 6 provides the gap closure record documenting requirements that were not mapped in TNA Section 26 and the resolution established through the SDP artifact series.

Every PRD requirement ID extracted from the PRD is represented in this matrix. Where a requirement was not traceable to a specific architecture element, the gap is documented with a resolution status. The treatment of REQ-SEC-015 is addressed in Section 6 — it appears in a PRD research table as a cross-reference notation, not as a standalone requirement definition; all actual security requirements in the PRD security section run REQ-SEC-001 through REQ-SEC-011, and REQ-SEC-015 is treated accordingly.

2. Functional Requirements Traceability (REQ-F)

Req ID Summary Priority Logical Components Data Entities Interfaces ADRs Risks SDP Artifacts Acceptance Method
REQ-F-001 Ingest de-identified DCPDS extract on schedule. Must Have LC-02; LC-03 DE-01; DE-03 INT-01; IF-01; IF-06 ADR-003; ADR-009 RISK-001; RISK-002; RISK-016 ART-03 (LC-02, LC-03); ART-04 (DE-01, DE-03); ART-05 (INT-01, IF-01) Data load executes on schedule; record counts logged; schema validates; zero PII fields in Processed Zone.
REQ-F-002 Ingest DLA TMS certification and training data. Must Have LC-02; LC-03 DE-04; DE-05 INT-02; IF-02; IF-06 ADR-003; ADR-009 RISK-016 ART-03; ART-04 (DE-04, DE-05); ART-05 (INT-02, IF-02) Certification currency fields populated; training history importable; schema validated.
REQ-F-003 Ingest DPMAP performance calibration data (aggregate only). Must Have LC-02; LC-03 DE-03 (performance tier attribute) INT-03; IF-03; IF-06 ADR-009 RISK-015; RISK-016 ART-03; ART-04 (DE-03); ART-05 (INT-03, IF-03) Performance tier data loaded; data use documentation in governance record; no individual records present.
REQ-F-004 Ingest EBS workload metrics. Should Have LC-02; LC-03 DE-06 INT-04; IF-04; IF-06 ADR-009 RISK-001 (EBS access dependency) ART-03; ART-04 (DE-06); ART-05 (INT-04, IF-04) Workload metrics mapped to organizational units; correlation calculable between staffing and throughput.
REQ-F-005 Accept OPM FWD as Phase I proxy data source. Must Have LC-02; LC-03 DE-01; DE-03 (proxy-derived) INT-05; IF-05 ADR-006 RISK-017; RISK-018 ART-03; ART-04 (DE-01, DE-03); ART-05 (INT-05, IF-05) OPM FWD data ingested; proxy flag set on all derived records; Phase I feasibility not blocked by DLA data delays.
REQ-F-006 Detect and reject PII fields at ingestion. Must Have LC-02 DE-03; DE-05 (source records pre-de-identification) IF-06 (zone boundary enforcement) ADR-002; ADR-001 RISK-016 ART-03 (LC-02); ART-04 (DE-03, DE-05); ART-05 (IF-06) Automated PII scan of Processed Zone: zero PII records. PII rejection events logged.
REQ-F-007 Maintain organizational ontology with position attributes. Must Have LC-04 DE-01; DE-02; DE-04 IF-07; IF-12 ADR-002 RISK-003 (position count dependency) ART-03 (LC-04); ART-04 (DE-01, DE-02); ART-05 (IF-07) All pilot sub-component positions represented; attributes populated; minimum 2 DLA SMEs confirm ontology fidelity.
REQ-F-008 Model workflow dependency relationships, including single-point-of-failure conditions. Must Have LC-04 DE-02 (workflow dependency attribute) IF-07 ADR-002 None direct ART-03 (LC-04); ART-04 (DE-02) Dependency graph navigable; at least one single-point-of-failure condition identified and SME-confirmed.
REQ-F-009 Compute and maintain readiness indicators per mission function area. Must Have LC-04 DE-07 IF-07; IF-12; IF-13 ADR-002 RISK-005 (performance dependency) ART-03 (LC-04); ART-04 (DE-07); ART-05 (IF-12, IF-13) Readiness indicators computed after each refresh; values traceable to source attributes; data currency timestamp present.
REQ-F-010 Implement ABM simulation engine capable of executing scenario runs. Must Have LC-06 DE-08 (simulation input); DE-09 (output) IF-10; IF-11 ADR-001; ADR-008 RISK-005 ART-03 (LC-06); ART-04 (DE-08, DE-09); ART-05 (IF-10, IF-11) ABM engine executes; agents instantiated from synthetic population; scenarios produce time-series outputs.
REQ-F-011 Provide preset scenario library with minimum 5 types. Must Have LC-06; LC-10 DE-09 IF-10 ADR-010 RISK-005 ART-03 (LC-06, LC-10); ART-04 (DE-09); ART-05 (IF-10) All 5 preset scenario types execute successfully within time limits.
REQ-F-012 Execute standard preset scenarios and return results within 5 minutes. Must Have LC-06 DE-09; DE-08 (input) IF-10; IF-11 ADR-001; ADR-008 RISK-005 ART-03 (LC-06); ART-04 (DE-09); ART-05 (IF-10, IF-11) Timed test: 95th percentile preset execution ≤ 5 minutes under 20 concurrent users.
REQ-F-013 Execute custom scenarios and return results within 15 minutes. Should Have LC-06; LC-10 DE-09 IF-10; IF-11 ADR-001; ADR-010 RISK-005 ART-03 (LC-06, LC-10); ART-04 (DE-09) Timed test: 95th percentile custom scenario execution ≤ 15 minutes.
REQ-F-014 Generate confidence intervals for all scenario outputs via Monte Carlo sampling. Must Have LC-06 DE-09 IF-11 ADR-001 None direct ART-03 (LC-06); ART-04 (DE-09) Confidence intervals displayed on all time-series forecast charts; sampling count in output metadata.
REQ-F-015 Generate synthetic population with differential privacy (epsilon ≤ 1.0). Must Have LC-05 DE-08; DE-12 IF-08; IF-09 ADR-007; ADR-002 RISK-003; RISK-007 ART-03 (LC-05); ART-04 (DE-08, DE-12); ART-05 (IF-08, IF-09) Epsilon ≤ 1.0 documented in DE-12 and verified; privacy audit report produced.
REQ-F-016 Validate synthetic population fidelity within 5% distributional deviation. Must Have LC-05 DE-08; DE-12 IF-09 ADR-007 RISK-003; RISK-007 ART-03 (LC-05); ART-04 (DE-08, DE-12) KS test and chi-squared test results documented; maximum deviation ≤ 5% across all tracked attributes.
REQ-F-017 Validate synthetic population privacy — membership inference attack success ≤ 50%. Must Have LC-05 DE-08; DE-12 IF-09 ADR-007 RISK-007 ART-03 (LC-05); ART-04 (DE-08, DE-12) Membership inference simulation results documented; attack success rate ≤ 50%.
REQ-F-018 Maintain auditable export log for all synthetic data export events. Must Have LC-05; LC-09 DE-10; DE-11 IF-14; IF-15 ADR-005; ADR-007 RISK-010 ART-03 (LC-05, LC-09); ART-04 (DE-10, DE-11); ART-05 (IF-14, IF-15) All export events appear in immutable log (DE-10); log searchable by requester, date, use case.
REQ-F-019 Provide enterprise readiness heat map updated on each refresh cycle. Must Have LC-07; LC-04 DE-07 IF-12 ADR-002 RISK-009 ART-03 (LC-07, LC-04); ART-04 (DE-07); ART-05 (IF-12) Heat map displays correctly for enterprise-level role; updates within 24 hours of data refresh; ≥ 5 mission function dimensions shown.
REQ-F-020 Provide activity-level position risk register. Must Have LC-07; LC-04 DE-01; DE-07 IF-12 ADR-002; ADR-004 RISK-013 ART-03 (LC-07, LC-04); ART-04 (DE-01, DE-07); ART-05 (IF-12) Risk register displays all positions in user's activity scope; fragility ratings computed; register sortable and filterable.
REQ-F-021 Provide historical analysis view with minimum 12 months of snapshots. Should Have LC-04; LC-07 DE-07 IF-12 ADR-002 None direct ART-03 (LC-04, LC-07); ART-04 (DE-07) 12 months of historical snapshots accessible; comparison view shows predicted vs. actual outcomes.
REQ-F-022 Generate automated threshold-based alerts for readiness indicators. Should Have LC-04; LC-11 DE-07 IF-13 ADR-010 None direct ART-03 (LC-04, LC-11); ART-04 (DE-07); ART-05 (IF-13) Alert triggers at correct threshold; delivery mechanism tested; alert logged with event details.
REQ-F-023 Allow export of scenario results in PDF and structured data (CSV or JSON). Must Have LC-07 DE-09 IF-15 (scenario export path) ADR-009 None direct ART-03 (LC-07); ART-04 (DE-09); ART-05 (IF-15) Export produces valid PDF and structured data file; all charts and tables rendered in PDF; structured data file parseable.

3. Non-Functional Requirements Traceability (REQ-NF)

Req ID Summary Priority Quality Attribute Logical Components ADRs Risks Acceptance Method
REQ-NF-001 Data refresh cycle ≤ 24 hours from source update. Must Have Performance — Data Currency LC-02; LC-04 ADR-006 RISK-001 (proxy path limits DLA-specific currency) Timestamp sampling: source extract timestamp vs. twin state update timestamp. Measured daily.
REQ-NF-002 Return preset scenario results within 5 minutes at 95th percentile. Must Have Performance — Scenario Execution LC-06 ADR-001 RISK-005 Timed execution tests of all 5 preset scenario types. 95th percentile ≤ 5 minutes.
REQ-NF-003 Support ≥ 20 concurrent users without degradation. Should Have Performance — Concurrency LC-01; LC-06 ADR-001; ADR-004 RISK-005 Load test with 20 simultaneous users executing preset scenarios. 95th percentile execution time ≤ 5 minutes.
REQ-NF-004 99.5% availability M–F 06:00–22:00 Eastern. Must Have Availability All services; deployment model ADR-006 RISK-008 (Phase II hosting model affects HA architecture) Monthly availability report: downtime ≤ 0.5% during operational hours.
REQ-NF-005 Synthetic population regeneration completes without data loss or corruption. Must Have Reliability LC-05 ADR-002; ADR-007 RISK-003; RISK-007 Hash verification of synthetic population file after each generation. Zero corrupt or incomplete files.
REQ-NF-006 Scale to support ontology of ≥ 30,000 positions without refresh degradation. Should Have Scalability LC-04 ADR-001 None direct (Phase II target) Performance test: full ontology refresh with 30,000 synthetic position nodes completes within 24 hours.
REQ-NF-007 Satisfy NIST SP 800-53 Moderate baseline (287 controls per SP 800-53B Release 5.2.0). Must Have Security All services; System Security Plan ADR-004; ADR-005; ADR-006 RISK-006; RISK-008 RMF assessment by DLA ISSO or independent assessor before Phase II ATO.
REQ-NF-008 No Privacy Act record in analytical, simulation, or reporting layers. Must Have Privacy LC-02; all data zone boundaries ADR-002; ADR-001 RISK-016 Privacy review: automated scan of Processed, Synthetic, and Analytical Zones for PII fields. Zero PII records.
REQ-NF-009 Obtain RMF ATO at DoD IL4 before processing live DLA workforce data. Must Have Compliance All services; deployment model ADR-006 RISK-008 ATO issued by DLA Authorizing Official before Phase II operational pilot begins.
REQ-NF-010 Activity Director completes preset scenario run within 15 minutes after 30-minute orientation. Must Have Usability LC-07; LC-06 ADR-010 RISK-009 Usability evaluation: ≥ 3 of 3 test users complete preset scenario run within 15 minutes without researcher assistance.
REQ-NF-011 Section 508 / WCAG 2.1 Level AA compliance for web-based interface. Must Have Accessibility LC-07 ADR-001 None direct Automated accessibility scan (zero critical failures); manual screen reader test before Phase I demonstration.
REQ-NF-012 Immutable audit logs retained for minimum 7 years. Must Have Auditability LC-09 ADR-005 RISK-014 Audit integrity test: attempt to modify log entry; confirm rejection. Retention test on records aged 3 years.
REQ-NF-013 Validate all ingested data against defined schema before loading. Must Have Data Integrity LC-02; LC-03 ADR-003 RISK-015; RISK-016 Test: inject schema-invalid records; confirm rejection and logging; zero invalid records in Processed Zone.
REQ-NF-014 Use standard data exchange formats (JSON, CSV, or XML) for all integration interfaces. Should Have Interoperability LC-02; LC-03; LC-07 ADR-003; ADR-009 None direct Integration test: confirm all interfaces produce parseable standard-format output.
REQ-NF-015 System health monitoring with alerts within 5 minutes of failure detection. Should Have Maintainability LC-11 ADR-001 RISK-014 Test: simulate ingestion pipeline failure; confirm alert delivered within 5 minutes.

4. Security, Compliance, Integration, UX, and Administrative Requirements Traceability

4.1 Security Requirements (REQ-SEC)

Req ID Summary Priority Logical Components ADRs NIST 800-53 Controls Risks Acceptance Method
REQ-SEC-001 MFA / CAC authentication required for all user access. Must Have LC-01; LC-08; INT-06 ADR-004 IA-2; IA-2(1); IA-2(2) RISK-004 CAC authentication functional; unauthorized access rejected; authentication events logged to LC-09.
REQ-SEC-002 Implement RBAC with four defined roles. Must Have LC-01; LC-08 ADR-004 AC-2; AC-3 RISK-013 Four roles provisioned in IAM; role assignments enforced at service boundary; unauthorized role access rejected.
REQ-SEC-003 Enforce least-privilege access for all roles. Must Have LC-01; LC-08; LC-04 ADR-004 AC-6 RISK-013 Each role can access only capabilities and data defined for that role; negative test cases pass.
REQ-SEC-004 Enforce activity-scoped data access for Activity Director role. Must Have LC-01; LC-04; LC-08 ADR-004 AC-4 RISK-013 Activity Director cannot access data from activities outside assigned scope; scope enforcement confirmed at LC-04 query layer.
REQ-SEC-005 Administrative access restricted to System Administrator; admins cannot access analytical data content. Must Have LC-08; LC-01 ADR-004 AC-6(1); AC-5 RISK-013 System Administrator cannot query or view workforce analytical data; administrative actions logged with attribution.
REQ-SEC-006 Encrypt all data in transit using TLS 1.2 or higher. Must Have All transport channels between components; LC-01 ADR-004 SC-8 None direct Security assessment: TLS version verification on all external and inter-service connections.
REQ-SEC-007 Encrypt all data at rest using AES-256 or FIPS 140-3 equivalent. Must Have All data zone storage; LC-09 audit log store ADR-002 SC-28 None direct Security assessment: verify encryption algorithm compliance across all four data zones and audit log store.
REQ-SEC-008 Manage encryption keys in FIPS 140-3 validated key management system; rotate annually. Must Have LC-12 ADR-004 SC-12 RISK-012 Annual rotation test (before Phase II deployment); zero service outage during rotation; rotation events logged.
REQ-SEC-009 Generate immutable audit log for all defined event types. Must Have LC-09 ADR-005 AU-2; AU-3; AU-9 RISK-014 Audit log integrity test; all 7 event categories from SDP-ART-02 confirmed logged; no missing events in test cycle.
REQ-SEC-010 Retain audit logs for minimum 7 years; accessible to authorized reviewers on demand. Must Have LC-09 ADR-005 AU-11 RISK-014 7-year retention policy configured and enforced by automated policy; log records accessible on demand.
REQ-SEC-011 Obtain RMF authorization at DoD IL4 before processing live DLA workforce data. Must Have All services; deployment model ADR-006 NIST SP 800-37 RMF process; DoDI 8510.01 RISK-008 ATO issued by DLA Authorizing Official. (Same acceptance as REQ-NF-009.)
REQ-SEC-015 [NOTE] This ID appears in a PRD research table as a cross-reference range notation ('REQ-SEC-001 through REQ-SEC-015') in the context of documenting the NIST 800-53 Moderate baseline requirement. No standalone requirement statement is defined at REQ-SEC-015 in the PRD security requirements section, which concludes at REQ-SEC-011. This ID is documented here as an artifact of the PRD research table notation; it does not require separate traceability. See Section 6 (Gap Closure Record) for formal disposition. N/A N/A N/A N/A None N/A

4.2 Compliance Requirements (REQ-COMP)

Req ID Summary Priority Logical Components Data Entities ADRs Risks Acceptance Method
REQ-COMP-001 Comply with Privacy Act of 1974; no Privacy Act record in simulation, analytical, or reporting layers. Must Have LC-02 (de-identification boundary); all data zones DE-03; DE-05 (source records, not stored as Privacy Act records in ALICE) ADR-002; ADR-001 RISK-016 Privacy review sign-off; automated PII scan of analytical environment; zero Privacy Act records confirmed.
REQ-COMP-002 DPMAP data use must comply with DoDI 1400.25, Vol. 431; data use documentation maintained. Must Have LC-02; LC-03 DE-03 (performance tier attribute) ADR-009 RISK-015 Data use documentation reference present in governance record (DGR-07); no individual DPMAP records in Processed Zone.
REQ-COMP-003 Achieve CMMC Level 2 C3PAO assessment before processing DLA CUI in non-federal systems. Must Have All SOL systems processing DLA CUI N/A ADR-006 RISK-006 CMMC Level 2 certificate from accredited C3PAO on file before November 10, 2026.
REQ-COMP-004 Document differential privacy parameters and maintain privacy audit records. Must Have LC-05 DE-12 (Generation Metadata) ADR-007 RISK-007; RISK-010 DE-12 records produced for every generation cycle; epsilon ≤ 1.0 documented; fidelity and privacy audit results present.
REQ-COMP-005 Web interface complies with Section 508 / WCAG 2.1 Level AA. Must Have LC-07 N/A ADR-001 None direct Same as REQ-NF-011 acceptance method.

4.3 Integration Requirements (REQ-INT)

Req ID Summary Priority Logical Components Interfaces ADRs Risks Acceptance Method
REQ-INT-001 Integration layer must be abstracted to accommodate DCPDS-to-DCHRMS transition. Must Have LC-03 INT-01; IF-01 ADR-003 RISK-002 Schema migration test: update LC-03 DCHRMS mapping; confirm all other services operate without code changes.
REQ-INT-003 DPMAP integration must comply with DoDI 1400.25 data use constraints (aggregate only). Must Have LC-02; LC-03 INT-03; IF-03 ADR-009 RISK-015 Data use agreement defines aggregate-only schema; no individual records in INT-03 extract; data structure validation in LC-02 confirms compliance.
REQ-INT-005 [NOTE] REQ-INT-005 appears in the PRD traceability matrix (Section 30) as part of the range 'REQ-INT-001 to REQ-INT-005.' The PRD integration requirements section (Section 19) presents integration requirements by system name without assigning individual REQ-INT numbers. REQ-INT-001 and REQ-INT-003 are the only explicitly numbered integration requirements in the PRD. REQ-INT-005 is treated as a range notation artifact. See Section 6 (Gap Closure Record) for formal disposition. N/A N/A N/A N/A None N/A

4.4 User Experience Requirements (REQ-UX)

Req ID Summary Priority Logical Components ADRs Risks Gap Status (TNA) Acceptance Method
REQ-UX-001 Primary readiness dashboard requires no configuration; updates automatically on each refresh. Must Have LC-07; LC-04 ADR-001; ADR-010 RISK-009 Partial — mapped in TNA as part of REQ-F-019 block; explicit UX trace resolved in this artifact. Dashboard auto-updates on each ingestion cycle without user action; no configuration required to display current state.
REQ-UX-002 Scenario planning workflow completable using only preset library, without ABM or ontology knowledge. Must Have LC-07; LC-06 ADR-001; ADR-010 RISK-009 Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Usability evaluation: Activity Director completes preset scenario run without knowledge of ABM model or ontology structure.
REQ-UX-003 Alert notifications delivered on next login if unacknowledged; include type, function, severity, timestamp. Should Have LC-07; LC-04; LC-11 ADR-010 None direct Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Alert notification displayed on next login if unacknowledged; all four required fields (type, function, severity, timestamp) present.
REQ-UX-004 All forms and input fields validate inputs in real time with actionable error messages. Must Have LC-07 ADR-001 None direct Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. UI test: submit invalid inputs on all forms; confirm real-time validation with clear, jargon-free error messages.
REQ-UX-005 Scenario results display readiness forecast as time-series chart with confidence band, at-risk positions as sortable list, response option comparison as table. Must Have LC-07 ADR-001 None direct Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Results validation: time-series chart with confidence band present; at-risk position list sortable; response option comparison table present.
REQ-UX-006 Guided onboarding workflow for first-time users of each role; ≤ 30 minutes to complete. Should Have LC-07 ADR-001 RISK-009 Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Onboarding test: new user in each role completes onboarding within 30 minutes without assistance.
REQ-UX-007 Decision support interface optimized for desktop (minimum 1280×800 resolution). Must Have (desktop) LC-07 ADR-001 None direct Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Display test: confirm correct rendering at 1280×800 resolution; no horizontal scroll or content clipping.
REQ-UX-008 Display data currency timestamp on all readiness indicators. Must Have LC-07; LC-04 ADR-001 None direct Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. UI audit: confirm data currency timestamp visible on all readiness indicator displays. No indicator displayed without timestamp.
REQ-UX-009 Export functions accessible within 2 clicks from primary result display. Should Have LC-07 ADR-001 None direct Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Navigation test: confirm export function reachable within 2 user interactions from the primary scenario result view.
REQ-UX-010 Interface complies with WCAG 2.1 Level AA (keyboard navigation, screen reader, color contrast). Must Have LC-07 ADR-001 None direct Partial — mapped in TNA as REQ-NF-011; explicit UX trace resolved here. Same as REQ-NF-011 acceptance method.

4.5 Administrative Requirements (REQ-ADM)

Req ID Summary Priority Logical Components ADRs Gap Status (TNA) Acceptance Method
REQ-ADM-001 System Administrator can create, modify, suspend, and revoke user accounts and role assignments. Must Have LC-08 ADR-004 Mapped in TNA (REQ-ADM-001 → LC-08). User provisioning test: Administrator creates, modifies, and revokes user account; confirm each action logged to LC-09.
REQ-ADM-002 System Administrator can configure readiness threshold values without modifying application code. Must Have LC-10 ADR-010 Mapped in TNA (REQ-ADM-002 → LC-10). Configuration test: update threshold value via admin interface; confirm readiness alert fires at new threshold; confirm code unchanged.
REQ-ADM-003 System Administrator can initiate and monitor data refresh jobs, view logs, manually trigger refresh. Must Have LC-11; LC-10; LC-02 ADR-001; ADR-010 Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Admin interface test: Administrator initiates manual refresh; job log visible; refresh executes and completes.
REQ-ADM-004 System Administrator can configure synthetic data export authorization workflow. Must Have LC-10; LC-05 ADR-010 Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Configuration test: Administrator configures required approver roles and documentation fields; export workflow reflects configuration.
REQ-ADM-005 System Administrator receives automated alerts for defined failure conditions. Should Have LC-11 ADR-001 Mapped in TNA (REQ-ADM-005 → LC-11). Alert test: simulate each defined failure condition; confirm alert delivered to System Administrator within 5 minutes.
REQ-ADM-006 System records all configuration changes with identity, prior value, new value, and timestamp. Must Have LC-10; LC-09 ADR-005; ADR-010 Mapped in TNA (REQ-ADM-006 → LC-10). Configuration change audit: make configuration change; confirm LC-09 log entry contains required fields.
REQ-ADM-007 System supports backup of configuration settings, ontology definitions, and synthetic population generation parameters on weekly scheduled basis and on demand. Must Have LC-10; LC-04; LC-05 ADR-010 Gap in TNA — not explicitly mapped. Resolved in SDP-ART-07. Backup test: execute scheduled backup; confirm all required configuration categories included; execute on-demand backup; confirm immediate execution.

5. CONOPS Operational Activity to Architecture Element Traceability

CONOPS Operational Activity Architecture Elements Operational Workflow (OW) Data Entities Interfaces Risks PRD Requirements Notes
Data ingestion from DCPDS, DLA TMS, DPMAP, and EBS to maintain the organizational twin. LC-02 (Data Ingestion); LC-03 (Schema Abstraction); LC-04 (Ontology Update upon completion) OW-1 (Continuous Organizational Readiness Monitoring) DE-01; DE-03; DE-04; DE-05; DE-06 INT-01 through INT-05; IF-01 through IF-07 RISK-001; RISK-002; RISK-015; RISK-016 REQ-F-001 through REQ-F-006; REQ-NF-001; REQ-NF-013 Schema abstraction (LC-03) required from Phase I Day 1 for DCHRMS migration resilience (ADR-003).
Construction and maintenance of the organizational ontology representing DLA positions, roles, and dependencies. LC-04 (Organizational Ontology Service) OW-1 (Continuous Monitoring — ontology update stage) DE-01; DE-02; DE-07 IF-07; IF-12 RISK-003 (position count); RISK-009 (adoption) REQ-F-007; REQ-F-008; REQ-F-009 Historical state archiving required for backtesting and trend analysis (Phase I deliverable).
Generation of privacy-preserving synthetic workforce population with differential privacy. LC-05 (Synthetic Workforce Engine); LC-09 (Audit Log — generation events) OW-4 (Synthetic Population Regeneration) DE-08; DE-12 IF-08; IF-09 RISK-003; RISK-007; RISK-010 REQ-F-015; REQ-F-016; REQ-F-017; REQ-F-018 Validation gates (fidelity and privacy) are mandatory before population promotion (ADR-007).
Agent-based simulation of workforce disruption scenarios against the synthetic population. LC-06 (ABM Simulation Engine); LC-10 (preset scenario library configuration) OW-2 (Scenario Planning — Key Departure example) DE-08 (input); DE-09 (output) IF-10; IF-11 RISK-005; RISK-009 REQ-F-010 through REQ-F-014 Simulation engine reads exclusively from Synthetic Zone (ADR-008). No Processed Zone access.
Role-differentiated decision support interface delivering readiness assessments and scenario outputs. LC-07 (Decision Support Interface) OW-1 (readiness display); OW-2 (scenario initiation and results) DE-07; DE-09 IF-12; IF-13 RISK-009 REQ-F-019 through REQ-F-023; REQ-UX-001 through REQ-UX-010 Section 508 compliance mandatory. Desktop-first design (REQ-UX-007). Data currency timestamp required on all indicators (REQ-UX-008).
Governed synthetic data export with Data Steward authorization and immutable audit record. LC-05 (export workflow); LC-09 (Audit Log — export events) OW-3 (Synthetic Data Export) DE-08 (exported); DE-10; DE-12 IF-14; IF-15 RISK-010 REQ-F-018 Steward authorization required for every export. DE-10 governance record non-deletable (ADR-005). CUI marking on all exports (ADR-007).
Privacy Act constraint resolution through de-identification at ingestion boundary. LC-02 (de-identification function); ADR-002 (Four-Zone Data Architecture) OW-1 (ingestion stage — Privacy Act enforcement point) DE-03; DE-05 (source records; de-identified before zone write) IF-06 RISK-016 REQ-NF-008; REQ-COMP-001; REQ-F-006 Architectural invariant (AP-1): not an application-layer control. De-identification specification document is a required pre-Phase I artifact.
Threshold-based alert generation for readiness degradation. LC-04 (threshold evaluation); LC-11 (alert delivery) OW-1 (alert stage) DE-07 IF-13 None direct REQ-F-022; REQ-UX-003 Alert delivery mechanism (in-system vs. email) is a configurable parameter (ADR-010). Alert mechanism must be defined before Phase II design.
Historical backtesting for Phase I validation of readiness forecast accuracy. LC-04 (historical state archive); LC-06 (backtesting simulation) OW-1 (historical snapshot stage) + OW-2 (backtesting runs) DE-07 (historical snapshots); DE-09 (backtesting scenario run) IF-07; IF-10; IF-11 RISK-003 REQ-F-021; PRD Section 12.2 (MVP success criteria — ≥ 80% accuracy) Phase I deliverable: backtesting accuracy report submitted to DLA GTPOC. Minimum 12 months of historical snapshots required.
User authentication via DoD CAC at the system access boundary. LC-01 (Interface Control); LC-08 (IAM); INT-06 (DoD PKI integration) All user-initiated workflows (OW-1 through OW-4 where user-initiated) N/A (identity metadata only) INT-06 RISK-004 REQ-SEC-001; DoDI 8520.02 CAC integration feasibility in Phase I environment is ASM-008 (assumption). If not available, interim MFA required.

6. Gap Closure Record

This section documents requirements and IDs identified in SDP-ART-01 (Research Log, Section 3.3) as gaps in the TNA traceability matrix, together with their resolution in this artifact. It also documents the formal disposition of ambiguous requirement identifiers.

6.1 PRD Requirement IDs with Ambiguous Status

ID Nature of Ambiguity Formal Disposition
REQ-SEC-015 Appears in the PRD research findings table (Section 3) as the upper bound of a range notation: 'REQ-SEC-001 through REQ-SEC-015.' The PRD security requirements section (Section 18) defines requirements from REQ-SEC-001 through REQ-SEC-011 only. No standalone requirement statement is defined at REQ-SEC-015. Disposition: REQ-SEC-015 is a range notation artifact, not a standalone requirement. The 287 NIST SP 800-53 Moderate baseline controls referenced in the research table notation are fully addressed through REQ-NF-007 and REQ-SEC-011. No additional architecture element is required. Recommend PRD owner confirm this interpretation and, if agreed, annotate Section 3 of the PRD to clarify the notation.
REQ-INT-005 Appears in the PRD traceability matrix (Section 30) as the upper bound of the range 'REQ-INT-001 to REQ-INT-005.' The PRD integration requirements section (Section 19) presents integration requirements by system name without assigning individual requirement numbers. Only REQ-INT-001 and REQ-INT-003 are explicitly numbered elsewhere in the PRD. Disposition: REQ-INT-002, REQ-INT-004, and REQ-INT-005 are not defined as standalone requirements in the PRD. The integration requirements for DLA TMS (INT-02), EBS (INT-04), and OPM FWD (INT-05) are fully addressed through REQ-F-002, REQ-F-004, and REQ-F-005 respectively, plus the general integration constraints in TNA Section 14.3. No architecture gap exists. Recommend PRD owner annotate Section 30 to clarify the range notation.

6.2 Requirements Not Mapped in TNA Section 26 — Resolved in SDP-ART-07

Requirement ID Summary Resolution in SDP-ART-07 Architecture Elements Mapped
REQ-ADM-003 System Administrator initiates and monitors data refresh jobs. Mapped in Section 4.5 of this artifact. LC-11 (Observability — job monitoring); LC-10 (Configuration Management — manual trigger configuration); LC-02 (Data Ingestion — execution).
REQ-ADM-004 System Administrator configures synthetic data export authorization workflow. Mapped in Section 4.5 of this artifact. LC-10 (Configuration Management — export workflow configuration); LC-05 (export workflow — governed by LC-10 settings).
REQ-COMP-002 DPMAP data use must comply with DoDI 1400.25, Vol. 431. Mapped in Section 4.2 of this artifact. LC-02 (ingestion validation); LC-03 (aggregate-only schema translation); INT-03; DE-03 (performance tier attribute); DGR-07.
REQ-INT-003 DPMAP integration must comply with DoDI 1400.25 data use constraints. Mapped in Section 4.3 of this artifact. LC-02; LC-03; INT-03; DGR-07.
REQ-UX-002 Scenario planning workflow completable using preset library without ABM or ontology knowledge. Mapped in Section 4.4 of this artifact. LC-07 (Decision Support Interface — preset scenario workflow design); LC-06 (Simulation Engine — preset library).
REQ-UX-003 Alert notifications delivered on next login with required fields. Mapped in Section 4.4 of this artifact. LC-07 (alert queue display); LC-04 (alert generation); LC-11 (alert delivery); IF-13.
REQ-UX-004 Real-time input validation with actionable error messages. Mapped in Section 4.4 of this artifact. LC-07 (Decision Support Interface — input validation in scenario initiation forms).
REQ-UX-005 Scenario results display format (time-series chart, sortable list, comparison table). Mapped in Section 4.4 of this artifact. LC-07 (Decision Support Interface — results rendering); LC-06 (simulation output structure per REQ-F-014).
REQ-UX-006 Guided onboarding workflow ≤ 30 minutes for first-time users. Mapped in Section 4.4 of this artifact. LC-07 (onboarding workflow design).
REQ-UX-007 Desktop optimization at minimum 1280×800 resolution. Mapped in Section 4.4 of this artifact. LC-07 (Decision Support Interface — responsive design constraint).
REQ-UX-008 Data currency timestamp on all readiness indicators. Mapped in Section 4.4 of this artifact. LC-07 (mandatory display element); LC-04 (currency timestamp attribute in DE-07).
REQ-UX-009 Export accessible within 2 clicks from primary result display. Mapped in Section 4.4 of this artifact. LC-07 (navigation design constraint for export function).

7. Architecture Principles to Requirement Traceability

The following table confirms that each of the ten architecture principles (AP-1 through AP-10) is grounded in at least one source requirement or operational need, consistent with ISO/IEC/IEEE 42010:2022 and Architecture Principle AP-8 (Traceability from Requirement to Architecture).

Architecture Principle Source Requirement(s) Source Basis ADRs That Apply This Principle
AP-1: Privacy as Architectural Invariant REQ-NF-008; REQ-COMP-001; 5 U.S.C. § 552a Privacy Act of 1974; PRD Section 18.3 ADR-002; ADR-007; ADR-008
AP-2: Read-Only External Integration PRD Section 2.6 (System Boundary); PRD Section 11.2 (Out of Scope) CONOPS design boundary; CON-002; CON-004 ADR-009
AP-3: Defense-in-Depth with Identity-Centric Controls REQ-SEC-001 through REQ-SEC-005; OMB M-22-09 NIST SP 800-207 (ZTA); RL-10; RL-17 ADR-004
AP-4: Data Zone Separation REQ-NF-008; REQ-COMP-001; REQ-SEC-007 5 U.S.C. § 552a; NIST SP 800-160 SSE; RL-11 ADR-002; ADR-008
AP-5: Modular Service Decomposition PRD Section 11 (phase-gated delivery); REQ-NF-006 (scalability); REQ-NF-002 (performance) SBIR phase structure; CONOPS OV-1 five-layer architecture ADR-001
AP-6: Immutable Audit by Design REQ-NF-012; REQ-SEC-009; REQ-SEC-010 NIST SP 800-53 AU-2, AU-9, AU-11; RL-08 ADR-005
AP-7: Configuration Over Customization REQ-ADM-002; REQ-ADM-004; REQ-ADM-006 Operational flexibility requirement; adoption risk reduction (RISK-009) ADR-010
AP-8: Traceability from Requirement to Architecture ISO/IEC/IEEE 42010:2022; RMF evidence requirements RL-28 (ISO 42010 standard); DoDI 8510.01 All ADRs
AP-9: Open Standards for Data Exchange REQ-NF-014 PRD Section 19 (Integration Requirements); RL-27 (DoDAF) ADR-003
AP-10: Phase-Gated Security Posture REQ-NF-009; CON-003; CON-005 DoDI 8510.01; SBIR program structure; PRD Section 11 ADR-006

8. SDP Artifact Cross-Reference Index

The following table documents which SDP artifact contains the authoritative specification for each class of architecture element, enabling rapid navigation across the Supporting Documentation Package.

Architecture Element Class Authoritative SDP Artifact Element IDs Cross-Referenced In
Research Log Entries SDP-ART-01 (Research Log) RL-01 through RL-37 ART-07 (this artifact, architecture principles and traceability notes)
Architecture Decision Records SDP-ART-02 (ADR Register) ADR-001 through ADR-010 ART-03 (LC component governing ADRs); ART-04 (DE entity governing ADRs); ART-05 (interface governing ADRs); ART-06 (risk-to-ADR mapping); ART-07 (requirement-to-ADR traceability)
Logical Service Components SDP-ART-03 (Component Catalog) LC-01 through LC-12 ART-07 (requirement-to-component traceability in Sections 2–5)
Data Entities SDP-ART-04 (Data Catalog) DE-01 through DE-12; DGR-01 through DGR-08 ART-07 (requirement-to-entity traceability in Sections 2–4)
Interfaces and Information Flows SDP-ART-05 (Interface Catalog) INT-01 through INT-06; IF-01 through IF-15; IGR-01 through IGR-07 ART-07 (requirement-to-interface traceability in Sections 2–5)
Risk Register SDP-ART-06 (Risk Register) RISK-001 through RISK-018 ART-07 (requirement-to-risk mapping in Sections 2–5)
Traceability Matrix SDP-ART-07 (this artifact) All requirement IDs; all CONOPS activities All prior SDP artifacts; TNA Section 26
Assumptions Register SDP-ART-08 (next artifact) ASM-001 through ASM-008 + SDP-identified assumptions ART-07 will be referenced by ART-08
Open Questions Register SDP-ART-09 (forthcoming) OQ-001 through OQ-010 + SDP-identified questions ART-07 will be referenced by ART-09
Technology Neutrality Review SDP-ART-10 (forthcoming) All architecture statements ART-07 (requirement-to-technology-neutral-statement confirmation)
Cross-Artifact Consistency Review SDP-ART-11 (forthcoming) All SDP artifact IDs Synthesizes all prior SDP artifacts

9. Traceability Coverage Summary

9.1 PRD Requirement Coverage

Requirement Category Total Requirements Fully Traced Gap Closed in SDP-ART-07 Ambiguous / Resolved
Functional (REQ-F) 23 (REQ-F-001 through REQ-F-023) 23 0 0
Non-Functional (REQ-NF) 15 (REQ-NF-001 through REQ-NF-015) 15 0 0
Security (REQ-SEC) 11 defined + 1 ambiguous (REQ-SEC-015) 11 (REQ-SEC-001 through REQ-SEC-011) 0 1 (REQ-SEC-015 — range notation artifact, no standalone requirement; see Section 6.1)
Compliance (REQ-COMP) 5 (REQ-COMP-001 through REQ-COMP-005) 5 0 0
Integration (REQ-INT) 2 defined + 1 ambiguous (REQ-INT-005) 2 (REQ-INT-001; REQ-INT-003) 0 1 (REQ-INT-005 — range notation artifact; see Section 6.1)
User Experience (REQ-UX) 10 (REQ-UX-001 through REQ-UX-010) 10 9 (REQ-UX-002 through REQ-UX-009 closed; REQ-UX-001 and REQ-UX-010 partial) 0
Administrative (REQ-ADM) 7 (REQ-ADM-001 through REQ-ADM-007) 7 4 (REQ-ADM-003, REQ-ADM-004, REQ-ADM-007 closed; REQ-ADM-005 already in TNA) 0
TOTAL 76 defined requirements + 2 ambiguous IDs 76 fully traced 13 gaps formally closed in SDP-ART-07 2 ambiguous IDs formally resolved

9.2 CONOPS Activity Coverage

Status Count CONOPS Activities
Fully traced to architecture elements 10 Data ingestion; Ontology construction; Synthetic generation; ABM simulation; Decision support interface; Synthetic data export; Privacy Act constraint resolution; Threshold alert generation; Historical backtesting; User authentication.
Partially in scope — deferred to Phase II 0 All 10 CONOPS activities are architecturally scoped in Phase I. Some activities have Phase II-only extensions (e.g., live API integration, enterprise-scale ontology) that are traced through the Phase I design artifacts.
Out of scope for ALICE architecture 0 All CONOPS activities within the ALICE system boundary are traced. Activities explicitly out of scope (e.g., write-back to source systems, automated personnel action generation) are documented in PRD Section 11.2 and are not expected to appear in traceability.

10. Gate-7 Summary and Decision Required

What Was Created

Artifact 7 (Traceability Matrix) provides complete bidirectional traceability coverage for all 76 PRD requirements and 10 CONOPS operational activities. It is organized across nine sections covering: functional requirements (Section 2); non-functional requirements (Section 3); security, compliance, integration, UX, and administrative requirements (Section 4); CONOPS activity traceability (Section 5); a gap closure record formally resolving 13 traceability gaps from TNA Section 26 and two ambiguous requirement IDs (Section 6); architecture principle grounding (Section 7); the SDP artifact cross-reference index (Section 8); and a traceability coverage summary (Section 9).

The artifact closes all traceability gaps identified in SDP-ART-01 (Research Log, Section 3.3): REQ-ADM-003, REQ-ADM-004, REQ-COMP-002, REQ-INT-003, REQ-UX-002 through REQ-UX-009, and REQ-ADM-007. It also formally disposes of REQ-SEC-015 and REQ-INT-005, which are range notation artifacts in the PRD rather than standalone requirements.

Open Issues

  • [For PRD Owner Confirmation] REQ-SEC-015 disposition: confirm that this ID is a range notation artifact in the PRD research table and not a standalone requirement. If a standalone requirement was intended at REQ-SEC-015, it must be defined and this artifact updated.

  • [For PRD Owner Confirmation] REQ-INT-005 disposition: confirm that this ID is a range notation artifact in PRD Section 30 and that REQ-INT-002, REQ-INT-004, and REQ-INT-005 are not intended as distinct standalone requirements. If standalone requirements were intended, they must be defined and this artifact updated.

  • [Ongoing] All open questions (OQ-001 through OQ-010) that affect traceability — particularly OQ-001 (pilot sub-component selection, which affects REQ-F-007 through REQ-F-009 acceptance scope) and OQ-002 (DUA authority, which affects REQ-F-001 acceptance timeline) — remain open. These will be formally addressed in SDP-ART-09 (Open Questions Register).

Decision Required

Gate-7 Decision: Please approve Artifact 7 (Traceability Matrix) to proceed to Artifact 8 (Assumptions Register), or provide specific revision instructions. If any requirement mapping, gap closure disposition, or CONOPS activity trace requires modification, please identify the specific requirement ID or CONOPS activity and the change required. Confirmation of the REQ-SEC-015 and REQ-INT-005 dispositions from the PRD owner would also be appropriate at this gate.